Ground-up construction

Ground-up commercial construction in San Antonio and the Hill Country.

From raw dirt to certificate of occupancy, Trusted builds pad sites, shell buildings, and complete facilities for owners, developers, and operators, with one accountable team from first budget through warranty.

What is ground-up construction?

New commercial buildings, built from the ground up.

Ground-up construction means building a new structure on an empty or cleared site, as opposed to renovating or finishing out an existing building. The work starts with the land itself: site evaluation, clearing and grading, drainage, utilities, and foundations. It ends with a finished, inspected building you can occupy.

As a San Antonio commercial general contractor, Trusted manages the whole sequence: preconstruction, design coordination, permitting guidance, site work, vertical construction, and closeout. Owners, brokers, and architects deal directly with the people accountable for the job, not a queue.

Owner-occupied buildings, investor-owned properties, and build-to-suit projects all follow the same path. What changes is the size, the structure, and the schedule. Learn how preconstruction sets up a ground-up project before the contract is signed.

What we build

Ground-up buildings for the way you operate.

Every building type has its own structure, systems, and schedule pressures. Here is where owners most often put us to work.

limestone and glass commercial office building with a covered entry
Office and medical

Office and medical buildings

Professional office buildings and clinical space, planned around tenant layouts, mechanical loads, and finish quality.

wheel loader and project signs on a cleared retail building site
Retail and restaurant

Retail, grocery, and restaurant buildings

Single-store builds and multi-location rollouts for regional and national operators, built around opening dates.

steel-framed warehouse interior with pallet racking and a forklift
Industrial and flex

Industrial, warehouse, and flex buildings

Steel-framed warehouses and flex space built around loading, racking, and the daily rhythm of operations.

steel-framed indoor basketball court and wellness building interior
Recreation and wellness

Recreation and specialty buildings

Courts, gyms, and wellness buildings where structure, flooring, and finishes all have to land together.

We also build schools, hospitals, hotels, and retail plazas. Larger and more complex projects are part of our work, with the same accountable team and the same standard as every other job.

The ground-up process

Six stages from raw land to move-in.

The same process whether the job is a small shell building or a full facility. You always know what is next, what it costs, and who is accountable.

  1. 01

    Conversation and site review

    Tell us the property, the intended use, and the timeline. We tell you what is realistic in this market, in plain numbers.

    First call
  2. 02

    Design assist

    We coordinate with your architect and engineers early to improve constructability, budgeting, and execution before drawings are final.

    Early coordination
  3. 03

    Preconstruction

    Budgets, value engineering, and a schedule you can hand to a lender, a board, or a tenant.

    Before contract
  4. 04

    Permitting and site work

    Clearing, grading, drainage, utilities, and paving done right, with permitting and jurisdiction guidance along the way.

    Dirt work
  5. 05

    Vertical construction

    Foundations, structure, exterior, roofing, and building systems under one superintendent and one project manager, with weekly reporting and no surprise change orders.

    Build
  6. 06

    Closeout and warranty

    Punch list, commissioning, closeout documents, and a certificate of occupancy, then a warranty number that reaches a real person.

    Handover
steel framing and metal wall panels inside a new commercial building shell

What is included

From pad site to certificate of occupancy.

A ground-up project is a chain of dependent steps. We manage each link and the handoffs between them.

Need only the base building? We build shell and metal buildings and can finish the interiors later as a tenant build-out.

Cost and schedule

What shapes the cost and timeline of a ground-up project.

Every site and building is different, so we do not quote a price per square foot from a web page. These are the factors that move the number most, and the ones we price first.

  1. The site

    Slope, rock, soils, drainage, and access change site work costs more than most owners expect, especially in the Hill Country.

  2. Utilities

    Water, sewer, electric, and gas connections, and the lead time to get each one to the property.

  3. Building type and structure

    Steel, masonry, and concrete systems price and schedule differently, and so do the uses they house.

  4. Design and finishes

    Storefront, mechanical systems, and interior finish level drive cost as much as square footage does.

  5. Permitting and approvals

    The jurisdiction, review cycles, and inspections set the start date and the pace of the work.

  6. Long-lead materials

    Electrical gear, roofing, and storefront can take months to arrive, so we flag and order early.

Who we build for

For the people shaping a new building.

If you are evaluating land, financing a project, or six months from breaking ground, this is the right time to talk. Here is who calls us and what they ask first.

Owners and developers

Know the real cost of a site before you commit capital to the land.

Typical questionWhat will it cost to build on this site?

Investors and landlords

Deliver a new building on a lender's schedule and a tenant's timeline.

Typical questionDoes this project pencil out?

Regional and national operators

Open a new location in this market with a team that answers the phone.

Typical questionCan we open by our target date?

Architects and engineers

Get a builder's input while the design can still move.

Typical questionCan this be built for the budget?

Our work

Ground-up work from our job sites.

Where we build

Ground-up construction across San Antonio and the Texas Hill Country.

Trusted is headquartered in Spring Branch and builds for owners throughout Central and South Texas, with experience in DFW, Houston, and the Rio Grande Valley. See the full service area map.

TIPS awarded contractor

Hire Trusted directly, without a public hard-bid process.

Trusted holds TIPS awarded contractor status through The Interlocal Purchasing System. For qualifying clients, that means we can be hired directly for ground-up construction, because we have already been publicly vetted.

Common questions

Ground-up construction questions, answered.

What is ground-up construction?

Ground-up construction means building a new structure on an empty or cleared site, rather than renovating or finishing out an existing building. It includes site work, foundations, structure, exterior, building systems, and interior finishes, through to a certificate of occupancy.

What is the difference between ground-up construction and a tenant build-out?

A ground-up project creates the building itself, starting with the land. A tenant build-out finishes the interior of space inside an existing building. Many owners do both: a shell building first, then tenant finish-out as leases are signed.

How long does ground-up commercial construction take?

It depends on the building type, size, site conditions, and permitting. A small steel or shell building can move quickly once permits are issued, while larger or more complex facilities take longer. During preconstruction we build a working schedule that includes approvals and long-lead items, so you have a realistic date before you commit.

How much does ground-up commercial construction cost in San Antonio?

There is no single price per square foot. Site conditions, utilities, structure, finishes, and building systems all move the number. We provide a preliminary budget during preconstruction, with the assumptions spelled out, and the first conversation costs nothing.

Do I need an architect before I call a general contractor?

No. Calling early is better. Trusted is a general contractor, not a design firm, so we coordinate with your architect and engineers through design assist to improve constructability and budget before drawings are final. If you do not have a design team yet, call us and we will explain what you need first.

Can you build on raw land or a pad site?

Yes. We build on raw land, cleared lots, and pad sites in commercial developments. Early site evaluation looks at access, drainage, utilities, and approvals so surprises show up before you close, not after.

What is a shell building, and do you build them?

A shell building is the structure and exterior of a building, delivered without tenant interiors so owners or tenants can finish the space later. Yes, we build shell buildings and can also complete them as tenant build-outs when the lease is ready.

What does TIPS awarded contractor status mean for my project?

Trusted holds TIPS awarded contractor status through The Interlocal Purchasing System. For qualifying clients, that means we can be hired directly, without running a public hard-bid process, because we have already been publicly vetted.

Do you build outside San Antonio?

Yes. We are headquartered in Spring Branch in the Texas Hill Country and build for owners across Bexar County, the Hill Country, the I-35 corridor, and South Texas, with experience in DFW, Houston, and the Rio Grande Valley. See where we build.

Start early

Planning a ground-up project?

Tell us about the site, the intended use, and your target date. We will tell you what is realistic, in plain numbers.