Data center and energy · Now offering

Data center and energy construction support in San Antonio and across Texas.

Specialized construction support for data center, energy, and infrastructure projects that need disciplined coordination, scheduling, and execution, from a San Antonio general contractor.

What is data center and energy construction?

Projects where schedule and coordination decide the outcome.

Data center, energy, and infrastructure projects are built around power, equipment, and dates that are hard to move. The construction includes site and civil work, concrete, structure, and coordination of specialty trades, and the controlling items are usually utilities and long-lead equipment, not the walls.

Trusted offers construction support for these projects: preconstruction, design coordination, permitting guidance, site work, construction, and closeout. We are a general contractor, not a designer or an equipment supplier, so we work with your design team and specialists and keep the schedule honest.

See how we handle site work and concrete, industrial buildings, and ground-up construction. And bring us in early: preconstruction is where the schedule and budget get real.

How we support

The construction work behind critical projects.

Every project has its own scope and specialists. Here is where Trusted fits.

yellow Cat excavator digging along a commercial site beside a highway
Site and civil

Site and civil work

Clearing, grading, and excavation that prepare the site and the pads on it.

crew member screeding fresh concrete at dusk beside an overpass
Concrete

Concrete and foundations

Forms, rebar, placement, and finishing for slabs, pads, and structural pours.

steel framing and metal wall panels inside a new commercial building shell
Structure

Steel and building shells

Steel-framed buildings and metal shells, framed and enclosed on schedule.

Cat excavator setting large corrugated drainage pipe on a commercial site
Utilities

Utilities and infrastructure coordination

Drainage, underground utilities, and coordination with providers and specialty trades.

We coordinate with your architect, engineers, and specialty trades. Specialized scope outside general contracting stays with the right specialists.

The data center and energy process

Six stages from first call to handover.

The same disciplined process we use on every project, tuned for schedules that are tied to power, equipment, and delivery dates.

  1. 01

    Conversation and requirements

    Tell us the project, the site, and the date that matters. We tell you what is realistic, in plain numbers, and where you may need other specialists.

    First call
  2. 02

    Design assist

    We coordinate with your architect, engineers, and stakeholders early to improve constructability, budgeting, and execution before construction begins.

    Early coordination
  3. 03

    Preconstruction

    Budgets, phasing, and a schedule built backward from your key date, with long-lead equipment and utilities flagged first.

    Before contract
  4. 04

    Permitting and site preparation

    Permit guidance, then clearing, grading, drainage, and utilities that make the site ready to build.

    Getting started
  5. 05

    Construction and coordination

    Concrete, structure, and trade coordination under one superintendent and one project manager, with weekly reporting and no surprise change orders.

    Build
  6. 06

    Closeout and handover

    Punch list, inspections, closeout documents, and a warranty number that reaches a real person.

    Handover
aerial view of a graded site with a curving drive lane beside a highway embankment

What is included

From site preparation to handover.

These projects are a chain of dependent steps with hard dates attached. We manage each link and the handoffs between them.

Evaluating a site or a project concept? Call us early. We will help you test the schedule and budget before you commit.

Cost and schedule

What shapes the cost and timeline of these projects.

Every project is different, so we do not quote a price per square foot from a web page. These are the factors that move the number and the date most, and the ones we price first.

  1. Power and utilities

    Utility availability, capacity, and connection lead times often control the whole schedule.

  2. Site and civil

    Soils, grading, drainage, and access shape earthwork, concrete, and sequencing.

  3. Long-lead equipment

    Electrical gear, cooling equipment, and other specialty items can take months to arrive.

  4. Schedule and phasing

    Delivery and energization dates drive how work is staged and what is ordered first.

  5. Security, safety, and access

    Controlled access, safety requirements, and site logistics add planning and coordination.

  6. Permitting and approvals

    Review cycles and inspections set the start date and the pace of the work.

Who we work with

For the people planning critical infrastructure.

If you are evaluating a site, planning a project, or building a team, this is the right time to talk. Here is who calls us and what they ask first.

Data center developers and operators

Get a builder's input on site, schedule, and cost before you commit.

Typical questionCan we hit our delivery date?

Energy and infrastructure owners

Plan construction around utilities, equipment, and approvals.

Typical questionWhat will it take to build here?

Engineers and design firms

Bring a general contractor in early to test constructability and budget.

Typical questionCan this be built for the budget?

Landowners and site developers

Understand what a site needs before pursuing specialized users.

Typical questionIs this site ready for a project like this?

Our work

The building blocks, from our job sites.

Where we build

Data center and energy support across San Antonio and Texas.

Trusted is headquartered in Spring Branch and builds for owners throughout Texas, with experience across Central and South Texas, DFW, Houston, and the Rio Grande Valley. See the full service area map.

TIPS awarded contractor

Hire Trusted directly, without a public hard-bid process.

Trusted holds TIPS awarded contractor status through The Interlocal Purchasing System. For qualifying clients, that means we can be hired directly for data center and energy projects, because we have already been publicly vetted.

Common questions

Data center and energy questions, answered.

What is data center construction?

Data center construction is the building of facilities that house computing, storage, and network equipment. These projects revolve around reliable power, cooling, security, and a tightly sequenced schedule. The work includes site and civil work, concrete, structure, and building systems, with long-lead equipment driving the timeline.

Does Trusted build data centers?

Data center and energy support is a service Trusted is now offering. We provide construction support for data center, energy, and infrastructure projects that need disciplined coordination, scheduling, and execution. Tell us about your project, and we will tell you plainly how we can help and where you may need other specialists.

What kinds of energy and infrastructure projects can you support?

We support site and civil work, concrete and foundations, steel and building shells, and construction coordination for energy and infrastructure projects. If your project has specialized scope outside general contracting, we coordinate with your design team and specialty trades.

Why does schedule matter so much on data center projects?

Capacity is often tied to a customer, a power connection, or a financing milestone, and equipment can take months to arrive. A plan that works backward from the energization or delivery date, with long-lead items ordered early, protects the whole project.

What is design assist, and does Trusted do the design?

Trusted is a general contractor, not an architect or engineer. Through design assist, we coordinate with your architect, engineers, and stakeholders early to improve constructability, budgeting, and execution before construction begins.

How do you handle power and utility coordination?

We review utility availability and routing early, coordinate with the design team and utility providers, and sequence site work and building construction around them. Power and utility timing often controls the overall schedule, so it is part of preconstruction.

How long does a data center or energy project take?

It depends on the size, the site, permitting, utility connections, and equipment lead times. During preconstruction we build a working schedule that includes those controlling items, so you have a realistic plan before you commit.

How much does data center construction cost?

There is no single price per square foot. Cost depends on the site, the power and cooling design, the structure, and the equipment. We provide a preliminary budget with the assumptions spelled out, and the first conversation costs nothing.

What does TIPS awarded contractor status mean for my project?

Trusted holds TIPS awarded contractor status through The Interlocal Purchasing System. For qualifying clients, that means we can be hired directly, without running a public hard-bid process, because we have already been publicly vetted.

Do you take data center and energy projects outside San Antonio?

Yes. We are headquartered in Spring Branch in the Texas Hill Country and serve owners throughout Texas, with experience across Central and South Texas, DFW, Houston, and the Rio Grande Valley. See where we build.

Start early

Planning a data center or energy project?

Tell us about the site, the project, and the date that matters. We will tell you what is realistic, in plain numbers.